系统集成项目管理工程师考试是全国计算机技术与软件专业资格(水平)考试的中级职称考试,也是企业评定系统集成资质必需的证书,是历年软考报名中的热点。
系统集成项目管理工程师考试中涉及大量的计算题,是考试的重点也是众多考生的噩梦和难以克服的难点,尤其是下午案例分析中的进度和成本计算题,在软考必须一次考试通过全部科目的背景下,计算题的对错将决定考试成败。
全面覆盖了自2009年上半年至2015年下半年共14次考试中的全部计算类试题。
书中系统、详细地解析了这些复杂计算题,详细到每个步骤,同时配有考点回顾和计算公式等相关内容,一切为了考生和读者能够真正吃透计算题。
考生读懂本书后,可以透彻地掌握考试涉及的所有计算类考点,并能清晰理解考试的命题规律与命题思路,可以大幅提高考试的通过率。
系统集成项目管理工程师考试是全国计算机技术与软件专业资格(水平)考试的中级职称考试,也是企业评定系统集成资质所必需的证书,是历年软考报名中的热点。
古人云,得中原者得天下;现下有,得计算题者得软考。系统集成项目管理工程师考试中涉及大量的计算题,是考试的重点也是众多考生难以克服的难点,尤其是下午案例分析中的进度和成本计算题,在软考必须一次考试通过全部科目的背景下,其重要性可以称之为“一题做错,考试全砸!”。
本书全面覆盖了自2009年上半年至2015年下半年共14次考试中的全部计算类试题(包括上午选择题和下午案例题),系统、详细地逐题解析了这些复杂计算题,并配有考点回顾和计算公式,一切为考生和读者能够真正吃透计算题服务。
参加考试的考生,认真读懂本书的内容后,可以透彻地掌握考试涉及的所有计算类考点,可以清晰理解考试的命题规律、命题思路,可以大幅提高考试的通过率。
第1章 进度管理计算题 ······································································1
1.1 单代号网络图 ················································································1
1.1.1 知识点回顾 ·····················································································1
1.1.2 历年试题解析 ··················································································2
1.2 双代号网络图 ················································································4
1.2.1 知识点回顾 ·····················································································4
1.2.2 历年试题解析 ··················································································5
1.3 关键路径法 ···················································································6
1.3.1 知识点回顾 ·····················································································6
1.3.2 历年试题解析 ··················································································8
1.4 进度压缩 ·····················································································14
1.4.1 知识点回顾 ···················································································14
1.4.2 历年试题解析 ················································································14
1.5 资源优化 ·····················································································18
1.5.1 知识点回顾 ···················································································18
1.5.2 历年试题解析 ················································································19
1.6 PERT估算 ···················································································22
1.6.1 知识点回顾 ···················································································22
1.6.2 历年试题解析 ················································································23
1.7 进度估算 ·····················································································28
1.7.1 知识点回顾 ···················································································28
1.7.2 历年试题解析 ················································································28
1.8 进度综合案例 ···············································································33
1.8.1 (2009上半年,下午)试题二···························································33
1.8.2 (2011下半年,下午)试题二 ···························································35
1.8.3 (2013上半年,下午)试题二···························································37
·VI·
第2章成本管理计算题 ···································································· 40
2.1 成本类型 ·····················································································40
2.1.1 知识点回顾 ··················································································· 40
2.1.2 历年试题解析 ················································································ 40
2.2 成本估算 ·····················································································45
2.2.1 知识点回顾 ··················································································· 45
2.2.2 历年试题解析 ················································································ 46
2.3 成本预算 ·····················································································50
2.3.1 知识点回顾 ··················································································· 50
2.3.2 历年试题解析 ················································································ 51
2.4 挣值管理 ·····················································································55
2.4.1 知识点回顾 ··················································································· 55
2.4.2 历年试题解析 ················································································ 59
2.5 成本预测 ·····················································································68
2.5.1 知识点回顾 ··················································································· 68
2.5.2 历年试题解析 ················································································ 69
2.6 成本综合案例 ···············································································72
2.6.1 (2009下半年,下午)试题四··························································· 73
2.6.2 (2010上半年,下午)试题二··························································· 74
2.6.3 (2010下半年,下午)试题二 ·························································· 75
2.6.4 (2011 上半年,下午)试题二 ··························································· 77
2.6.5 (2012下半年,下午)试题三··························································· 79
2.6.6 (2013下半年,下午)试题四··························································· 85
2.6.7 (2014上半年,下午)试题四··························································· 87
第3章进度成本综合案例题 ······························································ 89
3.1 (2012上半年,下午)试题二 ··························································89
3.2 (2014下半年,下午)试题一 ··························································92
3.3 (2015上半年,下午)试题一 ··························································94
3.4 (2015下半年,下午)试题四 ··························································98
·VII·
第4章风险管理计算题 ···································································103
第5章招标采购计算题 ···································································108
5.1 历年试题解析 ············································································· 108
5.2 综合案例 ··················································································· 120
5.2.1 (2009下半年,下午)试题一··························································120
5.2.2 (2013下半年,下午)试题二··························································122
5.2.3 (2015下半年,下午)试题一··························································123
第6章立项管理计算题 ···································································125
第7章信息技术计算题 ···································································129
第8章集成资质计算题 ···································································139
作为一名曾经在系统集成项目管理工程师考试中“栽过跟头”的过来人,我对计算题的难度和重要性深有体会。许多考生在备考时,容易忽略计算题,或者仅仅停留在表面理解。而这本书,恰恰补足了这一短板。它并非一本泛泛的习题集,而是一本真正意义上的“详解”类书籍。它的价值体现在对每一道真题的深度挖掘和解析上。我注意到,书中对很多题目的解析,都不仅仅局限于“给出答案”,而是追溯到考试大纲的要求,解释该题考察的知识点,并深入分析解题的思路和方法。例如,在面对一些涉及多重计算和关联的题目时,书中能清晰地展示计算的逻辑链条,帮助我们理解不同计算之间的内在联系。同时,书中还会提供一些通用的解题技巧和方法论,这些对于应对结构相似但数值不同的题目非常有帮助。我曾尝试过其他一些资料,但很多解析都显得过于简略,无法真正解决我遇到的疑难。而这本书的解析,详实而透彻,能够解答我所有的疑问,让我真正做到举一反三。对于想要在计算题上取得高分的考生来说,这本书无疑是不可或缺的学习伴侣。
评分我是一名在职备考者,时间非常宝贵。在有限的学习时间内,选择一本高效的复习资料至关重要。这本书最大的价值在于它的“精炼”和“实用”。它精准地聚焦于系统集成项目管理工程师考试中的计算类试题,而系统集成项目管理工程师的计算题,又是这个考试中相对独立且有一定难度的部分。这本书的编排逻辑非常清晰,它将计算题按照不同的知识模块进行分类,比如进度管理相关的计算,成本管理相关的计算,风险管理相关的计算等等。每个模块下都精选了历年真题,并且对每一道题都提供了详细到位的解析。我最欣赏的是,它的解析不仅仅是告诉“怎么算”,更重要的是告诉你“为什么这么算”,并且会点出相关的考点和易混淆的概念。这一点对于我这种需要快速掌握核心知识点的在职考生来说,简直是福音。不用在海量的资料中大海捞针,这本书直接把最精华、最容易考的部分提炼出来,并且用最易懂的方式讲解清楚。通过这本书的学习,我感觉自己在计算题方面的掌握程度有了质的飞跃,能够更自信地面对考试中的计算部分,大大节省了宝贵的复习时间。
评分坦白说,在接触这本书之前,我总是把系统集成项目管理工程师的计算题看作是考试中的“拦路虎”。各种复杂的公式,如挣值管理、关键路径法、风险概率与影响等,总是让我头昏脑涨,即使背下了公式,也常常在实际应用中出错。然而,这本书彻底改变了我对计算题的看法。它不是简单地堆砌题目,而是从最基础的概念讲起,循序渐进地引导读者理解每个计算背后的逻辑。例如,在讲解挣值管理时,书中不仅给出了PV、EV、AC、SV、CV、SPI、CPI等核心指标的定义,更通过生动形象的案例,解释了它们在项目实际执行过程中是如何产生的,以及如何通过这些指标来评估项目的进度和成本绩效。这种“知其然,更知其所以然”的学习方式,让我不再是被动地记忆,而是真正理解了计算的意义。更令人称赞的是,书中对每一道真题的解析都极为严谨,步骤清晰,逻辑严密,并且会标注出相关的知识点,方便考生回顾。我尝试着按照书中的方法,一道一道地去做题,去理解它的解析,结果发现,曾经让我感到无比棘手的计算题,竟然变得越来越容易掌握。这本书,就像一位经验丰富的老教授,耐心地解答我每一个疑惑,让我对计算题从陌生到熟悉,再到最后的自信。
评分这本书的出现,无疑是系统集成项目管理工程师备考者们的一道曙光。我当初在备考时,也曾为了寻找一套既能覆盖考试重点,又能提供深度解析的资料而苦恼。市面上的教材和辅导书琳琅满目,但很多要么过于理论化,要么解析不够透彻,真正能把计算题这一难点各个击破的书籍更是凤毛麟角。我拿到这本书时,第一感觉就是它解决了我的痛点。翻开目录,就能看到对于每一类计算题型的细致划分,并且在每一个题型下,都配备了大量的真题。更关键的是,它并没有止步于罗列真题,而是对每一道题都进行了详尽的解析。这种解析不是简单的给出答案,而是深入到计算的每一个步骤,解释公式的由来、参数的含义,以及解题思路的形成过程。有时候一道题可能涉及多个知识点,这本书就能巧妙地将这些知识点串联起来,让你不仅理解了这道题,更能触类旁通,掌握同类题型的解法。我尤其喜欢它在解析过程中穿插的“易错点提醒”和“解题技巧总结”,这些都是经验积累的精华,能帮助我们少走弯路,提高备考效率。对于那些害怕计算题的考生来说,这本书绝对是必不可少的“通关秘籍”,它会让你从“谈数色变”到“游刃有余”。
评分说实话,我是一个对数字和公式不太敏感的人,每次看到计算题就头疼。但在备考系统集成项目管理工程师时,计算题又是一个绕不开的坎。我尝试过很多资料,但很多都让我越看越糊涂,感觉自己是在死记硬背,根本没有真正理解。直到我遇到了这本书,才算找到了救星。这本书的厉害之处在于,它把复杂的计算题“庖丁解牛”般地剖析开来。它不会直接抛出公式,而是会先从最基础的概念讲起,然后一步步地引导你理解公式是如何推导出来的,每个变量代表什么意义,在实际项目中如何应用。举个例子,在讲解风险概率与影响分析时,书中会先介绍风险评估的基本模型,然后详细讲解如何计算风险值,并结合具体的案例来演示如何进行定性分析和定量分析。它的解析非常细致,每一个步骤都清晰明了,即使是我这样的“数学渣”,也能看得懂。而且,书中还特别强调了计算题中的一些“陷阱”和“易错点”,这些都是非常有用的提醒,能帮助我避免犯同样的错误。通过反复研读这本书,我对计算题的恐惧感大大降低,甚至开始享受解决这些问题的过程。
评分很给力 专业正版 希望今年可以过吧
评分资料不错,基本上书都在京东上买了,价格也还可以。
评分非常感谢京东商城给予的优质的服务,从仓储管理、物流配送等各方面都是做的非常好的。送货及时,配送员也非常的热情,有时候不方便收件的时候,也安排时间另行配送。同时京东商城在售后管理上也非常好的,以解客户忧患,排除万难。给予我们非常好的购物体验。
评分买来备战考试,多拜佛多烧香是没有用的,还是要脚踏实地的多看书
评分学习中,希望可以考过,书质量不错,物流快,很好
评分书收到了,全新没有问题。看了一下,应该很不错。很满意。
评分挺好的,就是刚买回家就有更划算的优惠券了,来回买了3次,比较折腾
评分买来备战考试,多拜佛多烧香是没有用的,还是要脚踏实地的多看书
评分应该是正版,像是彩印,希望今年可以一次性考过。。。
本站所有内容均为互联网搜索引擎提供的公开搜索信息,本站不存储任何数据与内容,任何内容与数据均与本站无关,如有需要请联系相关搜索引擎包括但不限于百度,google,bing,sogou 等
© 2025 book.tinynews.org All Rights Reserved. 静思书屋 版权所有